Slide
utah-oval-cover
Oval
UtahOval_aerial_800x375
olympic_oval_web
20210115_135851
Olympic oval edited compressor
IMG_0125
IMG_0054
20210115_135427
20180515_154618
previous arrow
next arrow
Slide
utah-oval-cover
Oval
UtahOval_aerial_800x375
olympic_oval_web
20210115_135851
Olympic oval edited compressor
IMG_0125
IMG_0054
20210115_135427
20180515_154618
previous arrow
next arrow

Utah Olympic Oval

Kearns, Utah

Year Completed: 2020

Scope: Known as the fastest track in the world, LA Roser assisted with installation and continued service to this world-class ice rink.

Louis A. Roser Company prolonged the life of this world record holding facility by replacing aging shell-and-tube heat exchangers. To ensure the long-term integrity of the rink’s piping, the cooling brine was flushed and replaced with new monitoring and chemical treatment capabilities. To reduce electrical costs, a new compressor with variable frequency drive (VFD) was installed. A full flow balance of the Calcium Chloride Brine was performed.

Those entrusted with maintaining the “fastest ice on earth” rely on Louis A. Roser company to continue to service their equipment on a regular basis.

IMG_9224
IMG_9226
IMG_9223
IMG_9222
IMG_9231
IMG_9229
IMG_9235
IMG_9247
IMG_9255
IMG_9227
IMG_9221
IMG_9220
previous arrow
next arrow
IMG_9224
IMG_9226
IMG_9223
IMG_9222
IMG_9231
IMG_9229
IMG_9235
IMG_9247
IMG_9255
IMG_9227
IMG_9221
IMG_9220
previous arrow
next arrow

Maverick Center

Salt Lake City, Utah

Year Completed: 2019

Scope: The Engineering team at Louis A. Roser Company was asked to evaluate the equipment at Maverik center and offer suggestions to run more efficiently and prolong the life of the facility, both with and without the ice floor in place. 

 

Our design was approved, and we worked with Lewis Young Robertson and Lux Energy to remove some of the aging equipment and install: 

  • A new Ammonia Compressor with a Variable Frequency Drive (VFD) 
  • New Evaporative Condenser and Cooling Towers 
  • Ammonia to Brine HX for the ice floor 
  • New Brine Pumps and associated piping 
  • Ammonia to Glycol HX for arena comfort cooling 

 

The retrofit went well, it works wonderfully, and looks amazing.  Best of all, the soft ice issues are resolved, and they have reduced electrical costs.  

Building
IMG_0015
IMG_0017
IMG_0023
previous arrow
next arrow
Building
IMG_0015
IMG_0017
IMG_0023
previous arrow
next arrow

Eccles Ice Center

Logan, Utah

Year Completed: 2018

Scope: The Louis A. Roser Company prolonged the life of this amazing facility by replacing the aged shell-and-tube heat exchanger. We also installed a new condenser and brine pump. The photos highlight the craftsmanship of our insulation team. We enjoy working with the Eccles Ice Center and are proud supports of their annual “Spice on Ice” event.