previous arrow
next arrow
previous arrownext arrow
Slider

Daily’s Premium Meats

Salt Lake City, Utah

Year Completed: 2020

Scope: The Louis A. Roser Company recently installed a cooling tower for the microwave units at Daily’s Premium Meats. This installation took a load off of their existing freezer system, allowing them to both save money and free up the system’s cooling capacity for other vital loads.

In addition, our exceptional team installed both an ammonia detection and ventilation system for their plant as well. This system is running well and is controlled by Alan Bradley PLC.

ready to work with us?